WebAPPLICATION FOR TEMPORARY POWER POLE INITIAL SUBMITTAL WILL INCLUDE THE FOLLOWING ITEMS If any submittals do not meet these requirements, they will You have applied for a permit under an exemption to that law. The actual installation timeframe will vary, but is typically between 10 to 15 business days after FPL is notified that the site is ready for installation. In addition to the above listed codes, include the information (per FBC-B) on title sheet as found on the attached link. Escambia County Building Inspections Division 3363 West Consequences of Non-Compliance WebNew residential, commercial, temporary power, lighting projects or standby work. No other circuit breakers can be installed. It can take up to 24 hours from when the invoice(s) was generated for the bill to be ready to pay. Web6051 Old Bagdad Highway, Suite 202| Milton, Florida 32583 . 100 Amp Meter Pole Installation SANTA ROSA COUNTY DEVELOPMENT SERVICES Completion This stage will display the completed work request(s) for the project. Download a wiring diagram in Adobe PDF format here. You can also contact a construction office near you. You will need your project or work request number to track a project within the Project Portal. 186 0 obj
<>stream
At this time we dont accept credit cards as a form of payment. WebStep 1: Apply for a building permit. WebTemporary Underground (TUG) Agreement Form PALM BEACH COUNTY BUILDING DIVISION 2300 N. Jog Road West Palm Beach, Florida 33411 Phone: 561-233-5000 When you submit an application, your project is created. An inspection is required for all new electric service installations and when FPL disconnects service for an electrical contractor to work on your electric equipment. Electrical Power Pole Diagram for Mobile Homes - Bay Throughout the project sediment & erosion control barriers are monitored. Total building projects right require the use of Required when any new electrical circuits are added, extended or service is changed. 2020 FLORIDA BUILDING CODE, BUILDING, 7TH EDITION 735 8th Street South, Naples, Florida 34102, Commission on Ethics and Governmental Integrity, Important News- Electronic Permitting. A work request or layout number will be sent to your email. Additional Requirements (PDF)
For example - high voltage, danger high voltage, etc. Additional forms, checklists and affidavits may be found on our Applications and Forms page, Building Inspection Division However, FPL may agree to provide a second voltage if: For additional information, check with your local inspecting authority and FPL Project Manager. Keep in mind card colors will vary depending on the type of request you are looking at: Projects, Work Requests, Appointments, etc. No temporary wiring (disconnects, whips, etc.) Temporary Power Use of electricity for a temporary use, including but not limited to weekend events, holiday associated sales, and uses approved through the Temporary Use process. WebStandby power shall be provided for emergency responder radio coverage systems required in Section 917 and the Florida Fire Prevention Code. When there are the appropriate power lines, transformers or other equipment at the site, FPL can install temporary electric service for a fee. This may take 2 or 3 working days after the inspection is received. WebA temporary construction power pole is not an approved means of energizing a building, structure, or vacant property. WebGuideline for Meter Enclosure Installations in Flood Zones: GS14.0 Other Requirements Right of Way Easement Forms for corporations and individuals must be completed fully You will need to provide the county building permit number, good driving directions and contact information. To check to see if a contractor is licensed in Florida please contact the Building Inspection Division office or visit the Department of Business and Professional Regulation website: https://www.myfloridalicense.com/wl11.asp. and withholding tax and provide workers' compensation for that employee, all as prescribed by law. Builders: Apply for Electric Service - Duke Energy We've packed your most requested services in one little app. Keep in mind that project administrators can see documents labeled as confidential in the Documents tab. Main service must be completely installed as per On Site City-Approved Riser Drawing. Step 8: CHELCO will make the final connections to your service. (This form requires use of Adobe Reader; click here to download Adobe Reader for free. All non-terminated, branch-circuit, current-carrying conductors must be terminated with wire nuts. Your Project's Status. You may review a sample copy of a residential permit application as a PDF, which also includes submittal requirements. You will need to specify the document type, if the document is confidential, and what project or work request the document relates too. Powerful service at your fingertips--wherever you go! Temporary Power Pole You may not delegate the responsibility for supervising work to a licensed contractor who is not licensed to perform the work being done. It is your responsibility to make sure that people employed by you have licenses required by state law and by county or municipal licensing ordinances. Pole It is approved for use in Florida Meter Group areas. 0
Permits are issued to Florida licensed contractors and qualifying owner builders as described below. WebSet Temporary Power Pole. Existing Services. Available times may vary by location. View PDF. Listed below are the typical inspections required for residential construction along with inspection codes and the phone numbers to call. All panels must be labeled. Before we can begin installation, we will need verification of the following: Please contact FPL several weeks before installing sod or sprinkler systems to minimize repairs. Environmental Inspection (850-891-1800): New, Additions, and Reroofs for Townhouse or Duplex (917): The inspection is to be done, if possible, during the installation of the roofing, but in any case, prior to the final building inspection. Rough-In Inspection (200): To be made after all electrical boxes and rough wiring is installed. Service upgrades, overhead to underground service conversions, disconnect/reconnect appointments or standby work Florida Administrative Code. Sign up for weekly storm and savings tips! To qualify for exemption under this subsection, an owner must personally appear and sign the building permit application. Step 2: Apply for new electric service and get a project ID. If you need to talk or meet with the CHELCO engineering representative, write a note on your application so that they will contact you. The 430 Underground Inspection must be made prior to the 450 Inspection or at the same time as the 450 Inspection. click here, Converting Condominium Lanai to Living Space, Sprinkler / Alarm Building Plan Requirements, Hazard Mitigation and Local Mitigation Strategy, Historical Building Permit Application Form, CO, TCO or CC REQUESTS - (active permits only), Online Payments for Old Paper Permits Only. Temporary Permanent Power Inspections | Naples, Florida ho6~L>PcN5mWgAT[u';I8kxD +g*fya2%ILB]Ic3 9-N1j&8hh0vuxc\s&L*
^2. FPL WebStep 1: Apply for a building permit. Single Phase Underground Service (400 Amp) All sub panels and sub panel feeders must be installed and terminated. After four unsuccessful login attempts, the Lost Password/User ID page is displayed and after more than 10 unsuccessful attempts, access to your account online will be blocked. Appointments may be scheduled Monday to Friday between the hours of 9:00 a.m. to 2:00 p.m. CHELCO's annual charity golf tournament raised over $8k, CHELCO powers-up first co-op solar array in NW Florida. ReRoof for Single Family - Detached only: A Nailing Inspection (115) is required, the spacing pattern should be 6" on center with 8-penny ring shank nails. WebTemporary Pole (500): If electrical power from the house cannot be used and temporary construction power is required, the temporary service pole must be inspected prior to the service being connected. FPLs standard fees for installing electric service for new construction projects are based on overhead facilities. Temporary poles will need to be inspected by the county. State law requires construction to be done by licensed contractors. To request temporary service, submit a project application for temporary power. If you continue to have difficulties logging in, please contact your local service center to get assistance from alocal project manager. This subsection does not exempt any person who is employed by or has a contract with such owner and who acts in the capacity of a contractor. WebTemporary Power Pole Permit ALL APPLICATIONS SHALL BE SUBMITTED USING THE ONLINE PORTAL https://www2.citizenserve.com/waltonplanning PLEASE BE ADVISED Request electric servicefor your residence, facility or to a temporary pole. Early Permanent Power Permit Application . Find answers to your questions about how to use the website and manage your FPL construction projects. Navigate to the Project and Work Request pages and select the Members section on the right. Temporary Permanent Power Inspection Requirements 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. Electrical Service Requirements - West Florida Electric The drawing must be on-site for the 450 inspections. To learn about the project life cycle process for temporary power, view project types. If a customer requests underground facilities, they must pay the cost differential. Our service crews will hook up the temporary pole. Fees for appointments after business hours will vary based on the scope of your appointment. Step 4 Install the meter base/ socket Please select the location of your service and well remember your selection for next time. A deposit to start service may be required. Webminimum 16', treated, round pole with 5" minimum top diameter #4 solid copper for 200 amp service #6 solid copper for 100 amp service multiple point grounding block flexible d 200 5/8 x 8' galvanized ground rod d ' ce pole and #6 bond stranded copper conductor or equivalent in 2" flex or rigid conduit use 2/0 thw hotlegs, with a #1 neutral Step 6: A CHELCO crew will install your service. (888) 223-0800. Step 4: Contact CHELCO when your meter base is installed and ready for permanent service. An FPL Project Manager will review your electrical plans and determine which of FPLs standard voltages will meet your electrical service needs. Underground facilities require additional construction and associated costs. WebGeneral Rules and Specifications (GRS) Spec. The county will notify CHELCO when your service has passed inspection. Yes. The county will notify CHELCO when it passes inspection. Construction - Tampa Electric Southland Utility Services (850) 307-1183, which has been contracted for many years to provide this service to CHELCO, will continue to be available to provide fee-based code calculations directly to builders. To learn about the project life cycle process for overhead to underground conversion, view project types. For additional information, check with your local inspecting authority and FPL Project Manager. Business, Instrument Transformer Rated Meter Sockets and CT Metering Cabinet list, Approved Metering Equipment Enclosure List, rates, rules and regulation and other information, Customer Care:
%%EOF
A project may contain one or many work requests and FPL will assign a unique number for each of them. 1-16 Location of non-oil filled electrical equipment. Underground Residential Service Policy As piece of the first things first philosophy, her are going toward need a temporary power pole. WebTemporary Pole (500): If electrical power from the house cannot be used and temporary construction power is required, the temporary service pole must be inspected prior to Youll need to provide the users Email, Name, and Role for the project. This is the final step. The exemption allows you, as the owner of your property, to act as your own contractor with certain restrictions even though you do not have a license. DATE Electric Service Standards 05-22-19 - Florida Power Required for any new gas piping, extending existing gas piping, or the installation or replacement of gas appliances.